Challenge:
-
An unfortunate Pipeline incident occurred at Zubair Field in Iraq that led to two fatalities
-
The client requested assistance to shut down 44 wells as it was going to take a very long time to shut down all these wells manually by field team, and time saving was vital as it was an emergency.
Solution:
-
As we provide monitoring 24/7 for well performances, we were able to respond to the client request immediately.
-
Using control screens in our advanced monitoring platforms we Managed to shut down all wells as requested in a few minutes
Results:
-
We managed to shut down all the requested wells remotely in a few minutes which saved a lot of time as manual shutdown for 44 wells would have taken hours which helped in avoiding any escalation for the ongoing emergency
-
Avoided the risk of night drive at the field which also decreased co2 emissions
-